B.T.S. – Flagstop Station

The freight ramp

Next I built the freight ramp to complete the platform area.

The freight ramp. I offset the risers to sit between the ends of the trim to help hold it in place

Scribed underside

Test fit of ramp

Test fit of ramp

Ramp stained and in place

The front gable

I wanted to get the gable trim on the front gable to help me position the gable correctly on the roof. For me, aligning the gable with the rest of the roof was the most difficult step.

Front gable trim added

Inside view of front gable. I should have scribed the boards front to back